While twin towers @live 2013 was blasting full swing... I'm waiting for this room to be operational. It's 0342 and testing and commissioning is still ongoing...
Subscribe to:
Posts (Atom)
While twin towers @live 2013 was blasting full swing... I'm waiting for this room to be operational. It's 0342 and testing and commissioning is still ongoing...